| ETP design - SCOPE OF WORK |
|
| Characterization of raw effluent to determine pollution load w.r.t relevant parameters |
|
| Inhouse treatability studies for determining suitable treatment scheme to reduce the parameters within permissible limits (by taking trials of various chemical and biological treatment options) |
|
| Preparation of flowdiagram of final treatment scheme |
|
| Calculation of dosing patterns and other operating parameters of the ETP |
|
| Design of various treatment units of the ETP based on hydraulics and retention times |
|
| Preparing dimensional drawings of ETP components |
|
| Preparing instrumentation drawings for the ETP components |
|
| To give budgetary cost for construction and operation of the ETP |
| |
| ETP Operation - SCOPE OF WORK |
|
| Civil construction of the ETP units starting from ground leveling |
|
| Foundations for equipment installations |
|
| Procurement of other units (finalizing supplier and follow up till installation and commissioning) |
|
| Piping connections (from component to component) |
|
| Electrical connections |
|
| Installation of pumps, aerators and other mechanical units |
|
| Commissioning of the ETP |
| |
 |